Approved

ქალაქი თბილისი , ყოფილი კრწანისის სამთავრობო რეზიდენციის ტერიტორია

AR11058731New constructionMulti-unit residential25 September 2024- Krtsanisi
Total floor area
12,917.1 m²
Building footprint
14,259.2 m²
Residential area
3,846 m²
Plot area
11,674 m²
Height
28.8 m
Depth below ground
10 m
Building volume
38,167.5 m³

Figures as the applicant entered them in the form; not verified.

Sign in to follow

Decision

Decision number
7396520
Decision date
28 February 2025
Outcome
Granted
Construction period
28 February 2025 – 28 February 2029
The city's decision report ↗ (opens in a new tab)

Source: TAS, the city's permit system - as of 21 November 2026

Applicant

Name
მზეონა ზუმბაძე
Developer (company ID)
404692533

People

  • Client
    Name
    გია ხოფერია
    Personal number
    *********76
    Organization
    შპს ,,აპარტ კრწანისი"
    Company code
    404692533
  • Chief architect
    Name
    დიმიტრი ჯობაძე
    Personal number
    *********46
    Organization
    შპს "ჰაუსარტ დიზაინი"
    Company code
    405535112
  • Co-authors
    Name
    ნინო მარგველაშვილი
  • Specialistმშენებლობის ორგანიზების კალენდარული გრაფიკი
    Name
    მზეონა ზუმბაძე
  • Specialistსაინჟინრო-გეოლოგიური კვლევის საექსპერტო შეფასება
    Name
    გურამი იაშვილი
  • Specialistფუძეების, საძირკვლებისა და სხვა ძირითადი კონსტრუქციების საექსპერტო შეფასება
    Name
    რამაზი აფხაძე
  • Specialistარქიტექტურული ნაწილების შესაბამისობა „ტექნიკური რეგლამენტის - შენობა-ნაგებობის უსაფრთხოების წესების დამტკიცების თაობაზე “ საქართველოს მთავრობის 2016 წლის 28 იანვრის N41 დადგენილებით დამტკიცებულ რეგლამენტთან
    Name
    ლევან ოქროპირიძე

The people the applicant named in the application form.

Parcel

Cadastral code
01.18.06.018.235
Owner
შპს ,,აპარტ კრწანისი" (404692533)
Area
11,674 m²
Land use
არასასოფლო სამეურნეო

Source: NAPR, the land registry - as of 1 October 2026

Plots and zoning

from the city zoning map (snapshot 30 September 2026)

Document

Number
AR11058731
Status
Approved
Registered
25 September 2024
Type
New construction

Source: TAS, the city's permit system - read from TAS 1 October 2026

Case progress

Length of the case
0 days
from the last re-submission to the decision
Rounds of remarks
19

Who holds the case comes from its current status; calendar days, counted only for a stretch the record dates; a round is each answer of the city.

Timeline

Newest first.

  1. 28 February 2025City answer

    1. შეთანხმდეს ქ. თბილისში, ქალაქი თბილისი , ყოფილი კრწანისის სამთავრობო რეზიდენციის ტერიტორია -ში, არსებულ მიწის ნაკვეთზე (ს/კ: №01.18.06.018.235) მრავალბინიანი საცხოვრებელი სახლი (ბლოკი N1) არქიტექტურული პროექტი. 2. გაიცეს მშენებლობის ნებართვა და გაცემულად ჩაითვალოს მშენებლობის სანებართვო მოწმობა. 3. მშენებლობის ვადა განისაზღვროს 2025 წლის 28 თებერვლიდან 2029 წლის 28 თებერვლის ჩათვლით, კალენდარული გრაფიკის შესაბამისად. 4. მშენებლობის ეტაპები განისაზღვროს შემდეგნაირად: 1) სამშენებლო მოედნის მოწესრიგება 2) შენობა-ნაგებობის გრუნტზე დაკვალვა და ძირითადი ღერძების დაფიქსირება 3) შენობა-ნაგებობის მიწის სამუშაოები შენობა-ნაგებობის ფუძის მოწყობის სამუშაოები შენობა-ნაგებობის საძირკვლის მოწყობის სამუშაოები ძირითადი კონსტრუქციული სისტემის მოწყობა შენობა-ნაგებობის ნულოვან ნიშნულამდე 4) ძირითადი კონსტრუქციული სისტემის მოწყობა შენობა-ნაგებობის ნულოვანი ნიშნულიდან 0.00---6.60მმდე; 6.60---13.20 მდე; 13.20---18.60 მდე 5) შენობა-ნაგებობის სახურავისა და გადახურვის მოწყობა 6) არამზიდი კონსტრუქციების მოწყობა 7) შენობა-ნაგებობის ლოკალური საერთო სარგებლობის საინჟინრო--ტექნიკური ქსელების მოწყობა 8) ტექნოლოგიური მოწყობილობების მონტაჟი 9) შენობა-ნაგებობის გარე მოსაპირკეთებელი სამუშაოები 10) მიწის ნაკვეთის კეთილმოწყობის სამუშაოები გაითვალისწინეთ: მშენებლობის ნებართვის მფლობელი (დამკვეთი) ვალდებულია “მშენებლობის ნებართვის გაცემისა და შენობა-ნაგებობის ექსპლუატაციაში მიღების წესისა და პირობების შესახებ” საქართველოს მთავრობის 2019 წლის 31 მაისის №255 დადგენილებით დამტკიცებული წესის შესაბამისად შეადგინოს მშენებლობის (ზედამხედველობის) ეტაპის დასრულების ოქმი და სამშენებლო/სანებართვო პირობებით დადგენილი მორიგი ეტაპის დასრულებამდე წერილობითი სახით წარადგინოს ქალაქ თბილისის მუნიციპალიტეტის მერიის მუნიციპალურ ინსპექციაში. აღნიშნული მოთხოვნის შეუსრულებლობა წარმოადგენს სანებართვო პირობების დარღვევას და იწვევს კანონმდებლობით გათვალისწინებულ პასუხისმგებლობას - დაჯარიმებას. საქართველოს სივრცის დაგეგმარების, არქიტექტურული და სამშენებლო საქმიანობის კოდექსის 1415 მუხლის შესაბამისად, შენობა-ნაგებობის მშენებლობისას მშენებლობის საჯარო ზედამხედველობის შესაბამისი ორგანოსთვის საეტაპო ოქმის დადგენილი წესით წარუდგენლობისთვის სამშენებლო სამართალდამრღვევს 2025 წლის 31 დეკემბრამდე არ დაეკისრება ამ კოდექსის 132-ე მუხლით გათვალისწინებული პასუხისმგებლობა. 5. განემარტოს დამკვეთს, რომ ვალდებულია სამშენებლო სამუშაოების დაწყებამდე უზრუნველყოს თვალსაჩინო ადგილას საინფორმაციო დაფის განთავსება, საპროექტო შენობის ვიზუალიზაციით და შესაბამისი რეკვიზიტებით. 6. ტერიტორიაზე ხაზობრივი ნაგებობების არსებობის შემთხვევაში საპროექტო ობიექტის მშენებლობის საკითხი წინასწარ იქნას შეთანხმებული ხაზობრივი ნაგებობის მესაკუთრესთან. 7. მშენებლობის წარმოებისას დაცული იქნას ტერიტორიაზე არსებული ხე–ნარგავები, ხის მოჭრის ან გადარგვის საჭიროების შემთხვევაში საკითხი წინასწარ იქნას შეთანხმებული ქ. თბილისის მუნიციპალიტეტის მერიის გარემოს დაცვის საქალაქო სამსახურთან.

    Show more
  2. 28 February 2025Decision7396520 - Granted
  3. 28 February 2025City answer
  4. 28 February 2025Files uploaded
  5. 28 February 2025Files uploaded
  6. 28 February 2025Files uploaded
  7. 24 February 2025City answer
  8. 24 February 2025Files uploaded
  9. 24 February 2025Files uploaded
  10. 24 February 2025Files uploaded
  11. 24 February 2025Files uploaded
  12. 21 February 2025Files uploaded
  13. 21 February 2025Files uploaded
  14. 21 February 2025Files uploaded
  15. 21 February 2025Files uploaded
  16. 10 February 2025City answer
  17. 28 January 2025City answer
  18. 30 December 2024City answer
  19. 30 December 2024Files uploaded
  20. 17 December 2024City answer
  21. 17 December 2024Files uploaded
  22. 17 December 2024Files uploaded
  23. 4 December 2024City answer
  24. 4 December 2024Files uploaded
  25. 2 December 2024City answer
  26. 2 December 2024Files uploaded
  27. 2 December 2024Files uploaded
  28. 2 December 2024Files uploaded
  29. 2 December 2024Files uploaded
  30. 2 December 2024Files uploaded
  31. 29 November 2024Files uploaded
  32. 29 November 2024Files uploaded
  33. 26 November 2024City answer
  34. 26 November 2024Files uploaded
  35. 26 November 2024Files uploaded
  36. 26 November 2024Files uploaded
  37. 22 November 2024City answer
  38. 22 November 2024Files uploaded
  39. 22 November 2024Files uploaded
  40. 22 November 2024Files uploaded
  41. 20 November 2024City answer
  42. 20 November 2024Files uploaded
  43. 20 November 2024Files uploaded
  44. 19 November 2024Files uploaded
  45. 14 November 2024City answer
  46. 14 November 2024Files uploaded
  47. 14 November 2024Files uploaded
  48. 14 November 2024Files uploaded
  49. 14 November 2024Files uploaded
  50. 14 November 2024Files uploaded
  51. 14 November 2024Files uploaded
  52. 13 November 2024Files uploaded
  53. 13 November 2024Files uploaded
  54. 13 November 2024Files uploaded
  55. 13 November 2024Files uploaded
  56. 12 November 2024Files uploaded
  57. 8 November 2024City answer
  58. 8 November 2024Files uploaded
  59. 8 November 2024Files uploaded
  60. 6 November 2024City answer
  61. 6 November 2024Files uploaded
  62. 30 October 2024City answer
  63. 30 October 2024Files uploaded
  64. 30 October 2024Files uploaded
  65. 23 October 2024City answer
  66. 23 October 2024Files uploaded
  67. 23 October 2024Files uploaded
  68. 20 October 2024City answer
  69. 20 October 2024Files uploaded
  70. 20 October 2024Files uploaded
  71. 20 October 2024Files uploaded
  72. 18 October 2024Files uploaded
  73. 17 October 2024Files uploaded
  74. 8 October 2024City answer
  75. 8 October 2024Files uploaded
  76. 8 October 2024Files uploaded
  77. 25 September 2024Files uploaded
  78. 23 September 2024Files uploaded
  79. 23 September 2024Files uploaded
  80. 23 September 2024Files uploaded
  81. 23 September 2024Files uploaded
  82. 23 September 2024Files uploaded
  83. 23 September 2024Files uploaded
  84. 23 September 2024Files uploaded

Documents

Drawings and project files65

  • კრწანისი_ჭრილები_23.09.2024.pdfOpen ↗
  • კრწანისი_ფასადები_23.09.2024.pdfOpen ↗
  • კრწანისი_ვიზუალიზაცია_23.09.2024.pdfOpen ↗
  • კრწანისი_გენ-გეგმა_23.09.2024.pdfOpen ↗
  • კრწანისი_გენ-გეგმა_23.09.2024.dwg
  • კრწანისი_გეგმები_23.09.2024 (2).pdfOpen ↗
Show all (65)
  • კრწანისი_გაერთიანებული ფაილი_23.09.2024.dwg
  • კრწანისი_ვიზუალიზაცია_23.09.2024.jpgOpen ↗
  • კრწანისი_ვიზუალიზაცია_23.09.2024.jpgOpen ↗
  • კრწანისი_ვიზუალიზაცია_23.09.2024.jpgOpen ↗
  • კრწანისი_გენ-გეგმა_23.09.2024.pdfOpen ↗
  • კრწანისი_გენ-გეგმა_rev.01_08.10.2024.pdfOpen ↗
  • კრწანისი_გენგეგმა_rev.01_08.10.2024.dwg
  • კრწანისი_გეგმები_rev.01_08.10.2024.pdfOpen ↗
  • კრწანისი_ფასადები_rev.01_08.10.2024.pdfOpen ↗
  • კრწანისი_გაერთიანებული ფაილი_rev.01_08.10.2024.dwg
  • კრწანისი_გენ-გეგმა_rev-02.pdfOpen ↗
  • კრწანისი_გენ-გეგმა_rev-02.dwg
  • კრწანისი_გეგმები_rev.02.pdfOpen ↗
  • კრწანისი_ფასადები_rev.02.pdfOpen ↗
  • კრწანისი_გაერთიანებული ფაილი_rev.02.dwg
  • კრწანისი_ჭრილები_rev.02.pdfOpen ↗
  • კრწანისი_გეგმები_rev.04 (არქიტექტურა).pdfOpen ↗
  • კრწანისი_ჭრილები_rev.04.pdfOpen ↗
  • კრწანისი_ფასადები_rev.04.pdfOpen ↗
  • კრწანისი_გაერთიანებული ფაილი_rev.04.dwg
  • კრწანისი_ბლოკი1_გეგმები_rev.05.pdfOpen ↗
  • კრწანისი_ბლოკი1_გაერთიანებული ფაილი_rev.05.dwg
  • კრწანისი_ბლოკი1_გაერთიანებული ფაილი_rev.05.dwg
  • კრწანისი_ბლოკი1_გეგმები_rev.05.pdfOpen ↗
  • კრწანისი_ბლოკი1_გეგმები_rev.06.pdfOpen ↗
  • კრწანისი_ჭრილები_rev.06.pdfOpen ↗
  • კრწანისი_ბლოკი1_გაერთიანებული ფაილი_rev.06.dwg
  • კრწანისი_ჭრილები_rev.06.pdfOpen ↗
  • კრწანისი_ბლოკი1_გეგმები_rev.06.pdfOpen ↗
  • კრწანისი_ბლოკი1_გეგმები_rev.06.pdfOpen ↗
  • კრწანისი_ბლოკი1_გაერთიანებული ფაილი_rev.06.dwg
  • კრწანისი_გენ-გეგმა_rev.06.pdfOpen ↗
  • კრწანისი_გენ-გეგმა_rev.06.dwg
  • კრწანისი_ბლოკი1_გაერთიანებული ფაილი_rev.06.dwg
  • კრწანისი_ფასადები_rev.06.pdfOpen ↗
  • კრწანისი_ბლოკი 1_გეგმები_rev.07.pdfOpen ↗
  • გეგმები 22.11.24.pdfOpen ↗
  • კრწანისი_ბლოკი 1_გეგმები_rev.08.pdfOpen ↗
  • კრწანისი_ბლოკი 1_გაერთიანებული ფაილი_rev.08.dwg
  • კრწანისი_ბლოკი 1_გეგმები_rev.09.pdfOpen ↗
  • კრწანისი_ბლოკი 1_გეგმები_rev.09.pdfOpen ↗
  • კრწანისი_ბლოკი 1_გაერთიანებული ფაილი_rev.09.dwg
  • კრწანისი_ბლოკი 1_გეგმები_rev.09_1.pdfOpen ↗
  • 20241230_კრწანისი_ბლოკი 1_გენ-გეგმა.pdfOpen ↗
  • 20241230_კრწანისი_ბლოკი 1_გენ-გეგმა.dwg
  • 20250221_კრწანისი_ბლოკი 1_გენ-გეგმა.pdfOpen ↗
  • 20250221_კრწანისი_ბლოკი 1_გენ-გეგმა.dwg
  • 20250221_კრწანისი_ბლოკი 1_გეგმები_rev.10.pdfOpen ↗
  • 20250221_კრწანისი_ბლოკი 1_ჭრილები_rev.07.pdfOpen ↗
  • 20250221_კრწანისი_ბლოკი 1_ფასადები_rev.07.pdfOpen ↗
  • კრწანისი_ბლოკი 1_გაერთიანებული ფაილი_rev.10.dwg
  • [number]_[number]_კრწანისი_ბლოკი 1_გენ-გეგმა.pdfOpen ↗
  • [number]_[number]_კრწანისი_ბლოკი 1_გენ-გეგმა.dwg
  • [number]_[number]_კრწანისი_ბლოკი 1_ფასადები_rev.07.pdfOpen ↗
  • ჭრილი.pdfOpen ↗
  • გეგმები.pdfOpen ↗
  • კრწანისი_ბლოკი 1_გაერთიანებული ფაილი_rev.10.dwg
  • ბლოკი 1_ვიზუალიზაცია.pdfOpen ↗
  • ცხრილები-გეგმები-ფასადები.pdfOpen ↗

Consents and orders1

  • იპოთეკარის თანხმობა - კრწანისი.pdfOpen ↗

Reports and surveys17

  • კრწანისი-გეოლოგიის საექსპერტო.pdfOpen ↗
  • კონსტრუქვიების ექსპერტიზა.pdfOpen ↗
  • კრწანისი გეოლოგია.pdfOpen ↗
  • კრწანისი-გეოლოგიის საექსპერტო.pdfOpen ↗
  • გეოლოგია-mep-კონსტრუქციები.rarOpen ↗
  • გეოლოგია-სექსპერტო-კორექტირებული.pdfOpen ↗
Show all (17)
  • 30.10.24 - გეოლოგია-mep-კონსტრუქციები.rarOpen ↗
  • 14.11.24 - გეოლოგია-mep-კონსტრუქციები.rarOpen ↗
  • 20.11.24 - გეოლოგია-mep-კონსტრუქციები.rarOpen ↗
  • 29.11.24 - გეოლოგია-mep-კონსტრუქციები.rarOpen ↗
  • 02.12.24 - გეოლოგია-mep-კონსტრუქციები.rarOpen ↗
  • 02.12.24 - გეოლოგია-mep-კონსტრუქციები.rarOpen ↗
  • 04.12.24 - გეოლოგია-mep-კონსტრუქციები.rarOpen ↗
  • 04.12.24+-+გეოლოგია-mep-კონსტრუქციები.rarOpen ↗
  • 21.02.2025 - გეოლოგია-mep-კონსტრუქციები.rarOpen ↗
  • [number]_52) 21.02.2025 - გეოლოგია-mep-კონსტრუქციები.rarOpen ↗
  • გეოლოგია. კონსტრუქცია. საინჟინრო.rarOpen ↗

Other files31

  • მშენებლობის ორგანიზების პროექტი.pdfOpen ↗
  • მშენებლობის ორგანიზების პროექტი.pdfOpen ↗
  • კრწანისი_სიმაღლის სქემა გრგ-დან.pdfOpen ↗
  • ექსპერტიზა 01.18.06.018.235.pdfOpen ↗
  • ენერგოეფექტურობა.pdfOpen ↗
  • ტრანსპორტის სქემა + პატრული + .pdfOpen ↗
Show all (31)
  • კრწანისი_გამწვანება_23.09.2024.pdfOpen ↗
  • კრწანისი_ბანერი.pdfOpen ↗
  • კრწანისი_არსებული ფოტოები_23.09.2024.pdfOpen ↗
  • Saeqsperto daskvna (I - bloki) - 20.09.24.pdfOpen ↗
  • კრწანისი_არსებული ფოტოები_rev.01_241003.pdfOpen ↗
  • ენერგოეფექტურობა-rev.01.pdfOpen ↗
  • ექსპერტიზა 01.18.06.018.235 - 08.10.2024.pdfOpen ↗
  • კრწანისი_ბანერი_rev.01_241003.pdfOpen ↗
  • ენერგოეფექტურობა 15.10.2024.pdfOpen ↗
  • ექსპერტიზა 01.18.06.018.235 - 15.10.2024.pdfOpen ↗
  • კ2 ქვითრები.pdfOpen ↗
  • დენდროპროექტი 20.10.2024 აპარტდ. კრწანისი.pdfOpen ↗
  • რეესტრი-ვალდებულების საფუძველი.pdfOpen ↗
  • ექსპერტიზა 01.18.06.018.235 - 29.10.2024.pdfOpen ↗
  • გამწვანება.pdfOpen ↗
  • ექსპერტიზა 01.18.06.018.235.13.11.2024.pdfOpen ↗
  • კრწანისი, გამწვ.პროექტი.pdfOpen ↗
  • მოპ-კრწანისი, ბლოკი I.pdfOpen ↗
  • Koreqtirebuli saeqsperto daskvna (I - bloki) - 22.11.24.pdfOpen ↗
  • ტზშ.pdfOpen ↗
  • კრწანისი - სატრანსპორტო 16.12.2024.pdfOpen ↗
  • განმარტება გრგ-ს სართულიანობასთან დაკავშირებით.pdfOpen ↗
  • 1.jpgOpen ↗
  • 2.jpgOpen ↗
  • 3.jpgOpen ↗

Files stay on the city's server. Personal documents (powers of attorney, ID) are not shown here.

All documents on docs.tbilisi.gov.ge ↗

Source: docs.tbilisi.gov.ge - This record reflects the public registry at fetch time and is not legal advice.Request removal