ქალაქი თბილისი , ქუჩა შეშელიძე , N 18

AR11069211Change to approved projectOther use28 January 2025
Total floor area
57,536.1 m²
Building footprint
64,760 m²
Residential area
25,435.4 m²
Plot area
9,377 m²
Height
105.6 m
Depth below ground
8.6 m
Building volume
166,512.3 m³

Figures as the applicant entered them in the form; not verified.

Sign in to follow

Decision

Decision number
7665673
Decision date
15 October 2025
Outcome
Granted
Construction period
15 October 2025 – 15 November 2027
The city's decision report ↗ (opens in a new tab)

Source: TAS, the city's permit system - as of 21 November 2026

Applicant

Name
მარიამ პაპუკაშვილი
Developer (company ID)
400347246

People

  • Client
    Name
    მიხეილ მიქაბერიძე
    Personal number
    *********02
    Organization
    შპს ალფა სახლი გლდანში
    Company code
    400347246
  • Chief architect
    Name
    მარიამ პაპუკაშვილი
    Personal number
    *********58
    Organization
    შპს სტუდიო ალფა სახლი
    Company code
    404664573
  • Specialistსაჭიროების შემთხვევაში მომიჯნავე შენობა-ნაგებობის კონსტრუქციული დასკვნა
    Name
    დემური ტაბატაძე
  • Specialistკორექტირებული პროექტის მშენებლობის ორგანიზების კალენდარული გრაფიკი
    Name
    მარიამ პაპუკაშვილი
  • Specialistსაინჟინრო-გეოლოგიური კვლევის საექსპერტო შეფასება
    Name
    გუგა ჭოხონელიძე
  • Specialistფუძეების, საძირკვლებისა და სხვა ძირითადი კონსტრუქციების საექსპერტო შეფასება
    Name
    დემური ტაბატაძე
  • Specialistარქიტექტურული ნაწილების შესაბამისობა „ტექნიკური რეგლამენტის - შენობა-ნაგებობის უსაფრთხოების წესების დამტკიცების თაობაზე “ საქართველოს მთავრობის 2016 წლის 28 იანვრის N41 დადგენილებით დამტკიცებულ რეგლამენტთან
    Name
    ლევანი ოქროპირიძე

The people the applicant named in the application form.

Parcel

Cadastral code
01.11.04.026.046
Owner
შპს "ხიდმშენი N2" (205269500) (205269500)
Area
9,377 m²
Land use
არასასოფლო სამეურნეო

Source: NAPR, the land registry - as of 3 October 2026

Plots and zoning

  • Zone
    Industrial
    Sub-zone
    s-1
    K1
    0
    K2
    0
    Industrial zone: the city map gives no K2 for this zone type (0 means "not published", not a building ban). Check the zoning regulation.
    K3
    0

from the city zoning map (snapshot 30 September 2026)

Document

Number
AR11069211
Status
Approved
Registered
28 January 2025
Type
Change to approved project

Source: TAS, the city's permit system - read from TAS 1 October 2026

Case progress

Length of the case
5 days
from the last re-submission to the decision
Rounds of remarks
21

Who holds the case comes from its current status; calendar days, counted only for a stretch the record dates; a round is each answer of the city.

Timeline

Newest first.

  1. 15 October 2025City answer

    1. შეთანხმდეს ქ. თბილისში, ქუჩა შეშელიძე , N 18 არსებულ მიწის ნაკვეთზე (ს/კ: №01.11.04.026.046) მრავალფუნქციური კომპლექსის/შენობის კორექტირებული არქიტექტურული პროექტი. 2. გაიცეს მშენებლობის ნებართვა და გაცემულად ჩაითვალოს მშენებლობის სანებართვო მოწმობა. 3. მშენებლობის ვადა განისაზღვროს 2025 წლის 15 ოქტომბრიდან 2027 წლის 15 ნოემბრის ჩათვლით, კალენდარული გრაფიკის შესაბამისად. 4. მშენებლობის ეტაპები განისაზღვროს შემდეგნაირად: 21) 26 სართულების ძირითადი კონსტრუქციული სისტემებისა, შენობა-ნაგებობის სახურავისა და გადახურვის მოწყობა +88.50, +94.80 და 97.00 ნიშნულზე ; 22) არამზიდი კონსტრუქციების მოწყობა ; 23) შენობა-ნაგებობის ლოკალური საერთო სარგებლობის საინჟინრო-ტექნიკური ქსელების მოწყობა ; 24) ტექნოლოგიური მოწყობილობების მონტაჟი ; 25) შენობა-ნაგებობის გარე მოსაპირკეთებელი სამუშაოები ; 26) მიწის ნაკვეთის კეთილმოწყობის სამუშაოები ; გაითვალისწინეთ: მშენებლობის ნებართვის მფლობელი (დამკვეთი) ვალდებულია “მშენებლობის ნებართვის გაცემისა და შენობა-ნაგებობის ექსპლუატაციაში მიღების წესისა და პირობების შესახებ” საქართველოს მთავრობის 2019 წლის 31 მაისის №255 დადგენილებით დამტკიცებული წესის შესაბამისად შეადგინოს მშენებლობის (ზედამხედველობის) ეტაპის დასრულების ოქმი და სამშენებლო/სანებართვო პირობებით დადგენილი მორიგი ეტაპის დასრულებამდე წერილობითი სახით წარადგინოს ქალაქ თბილისის მუნიციპალიტეტის მერიის მუნიციპალურ ინსპექციაში. აღნიშნული მოთხოვნის შეუსრულებლობა წარმოადგენს სანებართვო პირობების დარღვევას და იწვევს კანონმდებლობით გათვალისწინებულ პასუხისმგებლობას - დაჯარიმებას. საქართველოს სივრცის დაგეგმარების, არქიტექტურული და სამშენებლო საქმიანობის კოდექსის 1415 მუხლის შესაბამისად, შენობა-ნაგებობის მშენებლობისას მშენებლობის საჯარო ზედამხედველობის შესაბამისი ორგანოსთვის საეტაპო ოქმის დადგენილი წესით წარუდგენლობისთვის სამშენებლო სამართალდამრღვევს 2025 წლის 31 დეკემბრამდე არ დაეკისრება ამ კოდექსის 132-ე მუხლით გათვალისწინებული პასუხისმგებლობა. 5. განემარტოს დამკვეთს, რომ ვალდებულია სამშენებლო სამუშაოების დაწყებამდე უზრუნველყოს თვალსაჩინო ადგილას საინფორმაციო დაფის განთავსება, საპროექტო შენობის ვიზუალიზაციით და შესაბამისი რეკვიზიტებით. 6. ტერიტორიაზე ხაზობრივი ნაგებობების არსებობის შემთხვევაში საპროექტო ობიექტის მშენებლობის საკითხი წინასწარ იქნას შეთანხმებული ხაზობრივი ნაგებობის მესაკუთრესთან. 7. მშენებლობის წარმოებისას დაცული იქნას ტერიტორიაზე არსებული ხე–ნარგავები, ხის მოჭრის ან გადარგვის საჭიროების შემთხვევაში საკითხი წინასწარ იქნას შეთანხმებული ქ. თბილისის მუნიციპალიტეტის მერიის გარემოს დაცვის საქალაქო სამსახურთან.

    Show more
  2. 15 October 2025Decision7665673 - Granted
  3. 10 October 2025City answer
  4. 10 October 2025Files uploaded
  5. 10 October 2025Files uploaded
  6. 10 October 2025Files uploaded
  7. 10 October 2025Files uploaded
  8. 8 October 2025City answer
  9. 8 October 2025Files uploaded
  10. 8 October 2025Files uploaded
  11. 8 October 2025Files uploaded
  12. 8 October 2025Files uploaded
  13. 8 October 2025Files uploaded
  14. 8 October 2025Files uploaded
  15. 8 October 2025Files uploaded
  16. 3 October 2025City answer
  17. 3 October 2025Files uploaded
  18. 3 October 2025Files uploaded
  19. 3 October 2025Files uploaded
  20. 3 October 2025Files uploaded
  21. 1 October 2025City answer
  22. 1 October 2025Files uploaded
  23. 1 October 2025Files uploaded
  24. 1 October 2025Files uploaded
  25. 1 October 2025Files uploaded
  26. 26 September 2025City answer
  27. 26 September 2025Files uploaded
  28. 24 September 2025City answer
  29. 24 September 2025Files uploaded
  30. 24 September 2025Files uploaded
  31. 22 September 2025Files uploaded
  32. 22 September 2025Files uploaded
  33. 22 September 2025Files uploaded
  34. 18 September 2025City answer
  35. 16 September 2025City answer
  36. 16 September 2025Files uploaded
  37. 16 September 2025Files uploaded
  38. 16 September 2025Files uploaded
  39. 16 September 2025Files uploaded
  40. 16 September 2025Files uploaded
  41. 16 September 2025Files uploaded
  42. 12 September 2025Files uploaded
  43. 12 September 2025Files uploaded
  44. 12 September 2025Files uploaded
  45. 11 September 2025Files uploaded
  46. 11 September 2025Files uploaded
  47. 11 September 2025Files uploaded
  48. 11 September 2025Files uploaded
  49. 11 August 2025City answer
  50. 11 August 2025Files uploaded
  51. 11 August 2025Files uploaded
  52. 11 August 2025Files uploaded
  53. 11 August 2025Files uploaded
  54. 11 August 2025Files uploaded
  55. 8 August 2025Files uploaded
  56. 8 August 2025Files uploaded
  57. 8 August 2025Files uploaded
  58. 6 August 2025City answer
  59. 6 August 2025Files uploaded
  60. 6 August 2025Files uploaded
  61. 6 August 2025Files uploaded
  62. 6 August 2025Files uploaded
  63. 6 August 2025Files uploaded
  64. 6 August 2025Files uploaded
  65. 4 August 2025City answer
  66. 4 August 2025Files uploaded
  67. 4 August 2025Files uploaded
  68. 4 August 2025Files uploaded
  69. 4 August 2025Files uploaded
  70. 4 August 2025Files uploaded
  71. 4 August 2025Files uploaded
  72. 4 August 2025Files uploaded
  73. 4 August 2025Files uploaded
  74. 4 August 2025Files uploaded
  75. 29 July 2025City answer
  76. 29 July 2025Files uploaded
  77. 14 July 2025City answer
  78. 14 July 2025Files uploaded
  79. 14 July 2025Files uploaded
  80. 14 July 2025Files uploaded
  81. 14 July 2025Files uploaded
  82. 14 July 2025Files uploaded
  83. 14 July 2025Files uploaded
  84. 14 July 2025Files uploaded
  85. 11 July 2025Files uploaded
  86. 11 July 2025Files uploaded
  87. 9 July 2025City answer
  88. 9 July 2025Files uploaded
  89. 9 July 2025Files uploaded
  90. 9 July 2025Files uploaded
  91. 9 July 2025Files uploaded
  92. 9 July 2025Files uploaded
  93. 9 July 2025Files uploaded
  94. 9 July 2025Files uploaded
  95. 9 July 2025Files uploaded
  96. 9 July 2025Files uploaded
  97. 9 July 2025Files uploaded
  98. 4 July 2025City answer
  99. 4 July 2025Files uploaded
  100. 4 July 2025Files uploaded
  101. 4 July 2025Files uploaded
  102. 4 July 2025Files uploaded
  103. 4 July 2025Files uploaded
  104. 4 July 2025Files uploaded
  105. 4 July 2025Files uploaded
  106. 4 July 2025Files uploaded
  107. 4 July 2025Files uploaded
  108. 4 July 2025Files uploaded
  109. 4 July 2025Files uploaded
  110. 2 July 2025Files uploaded
  111. 26 June 2025City answer
  112. 25 June 2025City answer
  113. 25 June 2025Files uploaded
  114. 25 June 2025Files uploaded
  115. 25 June 2025Files uploaded
  116. 23 June 2025Files uploaded
  117. 23 June 2025Files uploaded
  118. 23 June 2025Files uploaded
  119. 23 June 2025Files uploaded
  120. 20 June 2025Files uploaded
  121. 20 June 2025Files uploaded
  122. 6 June 2025City answer
  123. 6 June 2025Files uploaded
  124. 6 June 2025Files uploaded
  125. 6 June 2025Files uploaded
  126. 20 May 2025Files uploaded
  127. 20 May 2025Files uploaded
  128. 20 May 2025Files uploaded
  129. 20 May 2025Files uploaded
  130. 20 May 2025Files uploaded
  131. 20 May 2025Files uploaded
  132. 20 May 2025Files uploaded
  133. 11 March 2025City answer
  134. 18 February 2025City answer
  135. 18 February 2025Files uploaded
  136. 18 February 2025Files uploaded
  137. 18 February 2025Files uploaded
  138. 18 February 2025Files uploaded
  139. 17 February 2025Files uploaded
  140. 17 February 2025Files uploaded
  141. 17 February 2025Files uploaded
  142. 17 February 2025Files uploaded
  143. 17 February 2025Files uploaded
  144. 17 February 2025Files uploaded
  145. 5 February 2025Files uploaded
  146. 5 February 2025Files uploaded
  147. 5 February 2025Files uploaded
  148. 5 February 2025Files uploaded
  149. 5 February 2025Files uploaded
  150. 28 January 2025Files uploaded
  151. 28 January 2025Files uploaded
  152. 27 January 2025Files uploaded
  153. 24 January 2025Files uploaded
  154. 24 January 2025Files uploaded
  155. 24 January 2025Files uploaded
  156. 24 January 2025Files uploaded
  157. 24 January 2025Files uploaded
  158. 22 January 2025Files uploaded
  159. 22 January 2025Files uploaded
  160. 22 January 2025Files uploaded
  161. 22 January 2025Files uploaded
  162. 19 December 2024Files uploaded
  163. 19 December 2024Files uploaded
  164. 9 December 2024Files uploaded
  165. 6 December 2024Files uploaded
  166. 6 December 2024Files uploaded

Documents

Drawings and project files112

  • გლდანი__არქივი.pla
  • გენ-გეგმა.pdfOpen ↗
  • ჭრილები.pdfOpen ↗
  • ფასადები.pdfOpen ↗
  • გენ-გეგმა DWG.dwg
  • გეგმები - 27.01.pdfOpen ↗
Show all (112)
  • გეგმები - 28.01.pdfOpen ↗
  • გენ-გეგმა 1.pdfOpen ↗
  • გენ-გეგმა.dwg
  • გლდანი__არქივი - 05.02.pla
  • გეგმები - 05.02.pdfOpen ↗
  • ჭრილები - 17.02..pdfOpen ↗
  • გენ-გეგმა - 17.02.pdfOpen ↗
  • გეგმები - 17.02.pdfOpen ↗
  • გენ-გეგმა DWG.dwg
  • ფასადები - 17.02..pdfOpen ↗
  • გლდანი 18.02..pla
  • გენ-გეგმა - 20.05.2025.pdfOpen ↗
  • გენ-გეგმა - 20.05.2025.dwg
  • გენ-გეგმა - 20.05.2025.pdfOpen ↗
  • გენ-გეგმა - 20.05.2025.dwg
  • ჭრილები - 19.05.2025.pdfOpen ↗
  • ფასადები - 19.05.2025.pdfOpen ↗
  • ვიზუალიზაცია 20.05.2025.pdfOpen ↗
  • შეშელიძე 20.05.2025.pla
  • ჭრილები - 05.06.2025.pdfOpen ↗
  • ფასადები - 05.06.25.pdfOpen ↗
  • შეშელიძე 05.06.25.pla
  • გაერთიანებული გეგმები - 06.06.2025.pdfOpen ↗
  • გენ-გეგმა 20.06.2025.pdfOpen ↗
  • გენ-გეგმა - 20.06.2025.dwg
  • გაერთიანებული გეგმები - 23.06.25.pdfOpen ↗
  • გლდანი.შეშელიძე 23.06.25.pla
  • გლდანი.შეშელიძე 24.06.25.pla
  • გაერთიანებული გეგმები - 25.06.pdfOpen ↗
  • გაერთიანებული გეგმები - 04.07.2025.pdfOpen ↗
  • ჭრილები 04.07.2025.pdfOpen ↗
  • ფასადები - 04.07.2025.pdfOpen ↗
  • გენ-გეგმა 04.07.2025.pdfOpen ↗
  • გენ-გეგმა - 04.07.2025.dwg
  • გლდანი.ასატვირთი04.07.pla
  • გაერთიანებული გეგმები - 04.07.25.pdfOpen ↗
  • გლდანი.04.07.2025.pla
  • ჭრილები 04.07.25.pdfOpen ↗
  • გენ-გეგმა 04.07.25.pdfOpen ↗
  • ფასადები 04.07.25.pdfOpen ↗
  • გლდანი.შეშელიძე 4.07.25.dwg
  • გენ-გეგმა 09.07.25.pdfOpen ↗
  • გლდანი.შეშელიძე 09.07.25.dwg
  • ჭრილები 09.07.25.pdfOpen ↗
  • ფასადები 09.07.25.pdfOpen ↗
  • გლდანი.შეშელიძე 09.07.25.pla
  • გაერთიანებული გეგმები - 09.07.25.pdfOpen ↗
  • გენ-გეგმა 11.07.25.pdfOpen ↗
  • გლდანი.შეშელიძე 09.07.25.dwg
  • გლდანი.შეშელიძე 14.07.25.pla
  • გლდანი.შეშელიძე. გენ.გეგმა 14.07.2025.dwg
  • გენ-გეგმა 14.07.25.pdfOpen ↗
  • არსებული სიტუაციის ამსახველი ფოტომასალა 07.10.2025.pdfOpen ↗
  • გაერთიანებული გეგმები - 14.07.25.pdfOpen ↗
  • გენ-გეგმა 04.08.2025.pdfOpen ↗
  • გენ-გეგმა 04.08.2025.dwg
  • ჭრილები 4.08.25.pdfOpen ↗
  • ფასადები 04.08.25.pdfOpen ↗
  • შეშელიძე 04.08.pla
  • შეშელიძე 04.08.25.pla
  • გეგმები - 04.08.25.pdfOpen ↗
  • ჭრილები 6.08.25 1.pdfOpen ↗
  • ფასადები 06.08.25.pdfOpen ↗
  • გენ-გეგმა 06.08.2025.pdfOpen ↗
  • შეშელიძე 06.08.2025.dwg
  • გაერთიანებული გეგმები 6.08.25 02.pdfOpen ↗
  • შეშელიძე.06.08.pla
  • შეშელიძე 08.08.2025.pla
  • გენ-გეგმა 08.08.2025.pdfOpen ↗
  • შეშელიძე 08.08.2025.dwg
  • გაერთიანებული გეგმები 10.08.25.pdfOpen ↗
  • ფასადები 11.08.25.pdfOpen ↗
  • გლდანი 11.08.25 ასატვირთი.pla
  • ჭრილები 11.08.25.pdfOpen ↗
  • გენ-გეგმა 10.09.2025.pdfOpen ↗
  • გენ-გეგმა - 10.09.2025.dwg
  • შეშელიძე ასატვირთი 09.09.2025.pla
  • გაერთიანებული გეგმები - 10.09.25.pdfOpen ↗
  • ჭრილები 10.09.25.pdfOpen ↗
  • ფასადები - 10.09.pdfOpen ↗
  • გენ-გეგმა 15.09.2025.pdfOpen ↗
  • გენ-გეგმა - 15.09.2025.dwg
  • გაერთიანებული გეგმები - 15.09.25.pdfOpen ↗
  • ჭრილები 15.09.25.pdfOpen ↗
  • ფასადები - 15.09.pdfOpen ↗
  • შეშელიძე ასატვირთი 16.09.2025.pla
  • ჭრილები 26.09.25.pdfOpen ↗
  • ჭრილები 01.10.2025.pdfOpen ↗
  • გაერთიანებული გეგმები - 01.10.2025.pdfOpen ↗
  • ფასადები -01.10.2025.pdfOpen ↗
  • შეშელიძე 01.10.2025 ასატვირთი.pla
  • ფასადები -01.10.2025..pdfOpen ↗
  • გაერთიანებული გეგმები - 03.10.2025.pdfOpen ↗
  • ჭრილები 03.10.2025.pdfOpen ↗
  • გაერთიანებული გეგმები - 03.10.2025.pdfOpen ↗
  • გაერთიანებული გეგმები - 03.10.2025.pdfOpen ↗
  • შეშელიძე 08.10.25 ასატვირთი.pla
  • გლდანი 08.10.25 ასატვირთი.pla
  • გლდანი 08.10.25 ასატვირთი ფაილი.pla
  • გაერთიანებული გეგმები - 08.10.pdfOpen ↗
  • შეშელიძე m 08.10.pla
  • გაერთიანებული გეგმები - 08.10 მ.pdfOpen ↗
  • გენ-გეგმა 09.10.2025.pdfOpen ↗
  • გენ-გეგმა - 09.10.2025.dwg
  • შეშელიძე m 10.10.25.pla
  • გაერთიანებული გეგმები - 10.10.25.pdfOpen ↗

Reports and surveys10

  • გეოლოგია ექსპერტიზით.pdfOpen ↗
  • კონსტრუქციების საექსპერტო შეფასება_compressed.pdfOpen ↗
  • მომიჯნავეების დასკვნა.pdfOpen ↗
  • კონსტრუქცია 02.07.2025.pdfOpen ↗
  • კონსტრუქცია 14.07.2025.pdfOpen ↗
  • კონსტრუქცია - გაერთიანებული - 08.08.25.pdfOpen ↗
Show all (10)
  • კონსტრუქცია გაერთიანებული - 11.08.2025.pdfOpen ↗
  • კონსტრუქცია გაერთიანებული - 12.09.2025.pdfOpen ↗
  • საინჟინრო და სახანძრო 24.09.2025.pdfOpen ↗
  • კონსტ. ექსპერტიზა და დასკვნა დარღვევებზე 08.10.25.pdfOpen ↗

Other files96

  • შეთანხმებული ფოტომონტაჟი.pdfOpen ↗
  • ბანერი.pdfOpen ↗
  • კონტრუქცია 20.01.pdfOpen ↗
  • ფოტოები.pdfOpen ↗
  • სატრანსპორტო + ხაზოვანები.pdfOpen ↗
  • 1.jpgOpen ↗
Show all (96)
  • 2.jpgOpen ↗
  • 3.jpgOpen ↗
  • 4.jpgOpen ↗
  • სიმაღლის სქემა.pdfOpen ↗
  • ფოტომონტაჟი და აქსონომეტრიული ხედები.pdfOpen ↗
  • მშენებლობის ორგანიზების პროექტი.pdfOpen ↗
  • 41 ექსპერტიზა; 01.11.04.026.046 - 28.01.2025.pdfOpen ↗
  • საყრდენი კედელი 1.pdfOpen ↗
  • მშენ. ორგანიზების პროექტი და ეტაპები.pdfOpen ↗
  • საყრდენი კედელი - 17.02.pdfOpen ↗
  • სიმაღლის განსაზღვრის სქემა - 17.02.pdfOpen ↗
  • მშენ. ორგანიზების პროექტი და ეტაპები - 17.02.pdfOpen ↗
  • არსებული ფოტოები - 17.02.pdfOpen ↗
  • ფოტომონტაჟი და აქსონომეტრიული ხედები.pdfOpen ↗
  • 1.jpgOpen ↗
  • 2.jpgOpen ↗
  • 3.jpgOpen ↗
  • 4.jpgOpen ↗
  • ფოტომონტაჟი და აქსონომეტრია.pdfOpen ↗
  • გრუნტის ცვლილება 20.05.2025.pdfOpen ↗
  • სიმაღლის განსაზღვრის სქემა - 19.05.2025.pdfOpen ↗
  • 1.jpgOpen ↗
  • 2.jpgOpen ↗
  • 3.jpgOpen ↗
  • 4.jpgOpen ↗
  • გრუნტის ცვლილება 20.06.2025-compressed.pdfOpen ↗
  • გრუნტის ცვლილება 23.06.pdfOpen ↗
  • მშენ. ორგანიზების პროექტი და ეტაპები - 23.06.pdfOpen ↗
  • მშენ. ორგანიზების პროექტი და ეტაპები - 23.06.pdfOpen ↗
  • გრუნტის ცვლილება 23.06.pdfOpen ↗
  • გამწვანების პროექტი 04.07.2025_compressed.pdfOpen ↗
  • გრუნტის ზედაპირის ცვლილების სქემა04.07.2025.pdfOpen ↗
  • გრუნტის ზედაპირის ცვლილების სქემა04.07.2025.pdfOpen ↗
  • ფოტომონტაჟი 04.07.2025.pdfOpen ↗
  • გრუნტის ზედაპირის ცვლილების სქემა04.07.2025.pdfOpen ↗
  • არსებული ფოტოები 09.07.25.pdfOpen ↗
  • სიმაღლის სქემა - 04.07.pdfOpen ↗
  • არსებული ფოტოები -.pdfOpen ↗
  • ფოტომონტაჟი და აქსონომეტრიული ხედები.pdfOpen ↗
  • სიმაღლის სქემა - 09.07.pdfOpen ↗
  • გამწვანების პროექტი 09.07.2025.pdfOpen ↗
  • გრუნტის ზედაპირის ცვლილების სქემა 09.07.2025 1 (2).pdfOpen ↗
  • ექსპერტიზა გლდანი 01.11.04.026.046 - 11.07.2025.pdfOpen ↗
  • საყრდენი კედელი - 11.07.25.pdfOpen ↗
  • არსებული ფოტოები 07.10.2025.pdfOpen ↗
  • 322-2025.pdfOpen ↗
  • ექსპერტიზა გლდანი - 04.08.2025.pdfOpen ↗
  • b.jpgOpen ↗
  • c.jpgOpen ↗
  • d.jpgOpen ↗
  • 5.jpgOpen ↗
  • გაერთიანებული ლიფტები 4.08.25.pdfOpen ↗
  • ფოტომონტაჟი და აქსონომეტრიული ხედები 04.08.pdfOpen ↗
  • სიმაღლის სქემა 04.08.pdfOpen ↗
  • მშენ. ორგანიზების პროექტი და ეტაპები - 04.08.25.pdfOpen ↗
  • განმარტება ფუნქციურ გადანაწილებაზე და კ2 ათვისებაზე.pdfOpen ↗
  • მშენ. ორგანიზების პროექტი და ეტაპები - 06.08..pdfOpen ↗
  • სიმაღლის სქემა 04.08.pdfOpen ↗
  • 1.jpgOpen ↗
  • 3-.jpgOpen ↗
  • 4.jpgOpen ↗
  • ფოტომონტაჟი და აქსონომეტრიული ხედები 11.08.pdfOpen ↗
  • გრუნტის ცვლილება 11.09.2025.pdfOpen ↗
  • საყრდენი კედელი - 10.09.2025.pdfOpen ↗
  • ფოტომონტაჟი და აქსონომეტრიული ხედები 11.09.pdfOpen ↗
  • 1.jpgOpen ↗
  • 2.jpgOpen ↗
  • 4.jpgOpen ↗
  • 1.jpgOpen ↗
  • მშენ. ორგანიზების პროექტი და ეტაპები - 10.09.2025.pdfOpen ↗
  • განმარტება ფუნქციურ გადანაწილებაზე და კ2 ათვისებაზე.pdfOpen ↗
  • სიმაღლის განსაზღვრის სქემა - 10.09.2025.pdfOpen ↗
  • 41 ექსპერტიზა გლდანი - 11.09.2025.pdfOpen ↗
  • 41 ექსპერტიზა გლდანი - 11.09.2025.pdfOpen ↗
  • გრუნტის ცვლილება 16.09.2025.pdfOpen ↗
  • საყრდენი კედელი - 16.09.2025.pdfOpen ↗
  • სიმაღლის განსაზღვრის სქემა - 15.09.2025.pdfOpen ↗
  • მშენ. ორგანიზების პროექტი და ეტაპები - 10.09.2025.pdfOpen ↗
  • 1.jpgOpen ↗
  • 3.jpgOpen ↗
  • 5.jpgOpen ↗
  • 4.jpgOpen ↗
  • ფოტომონტაჟი და აქსონომეტრიული ხედები 16.09.25.pdfOpen ↗
  • მშენ. ორგანიზების პროექტი და ეტაპები - 22.09.2025.pdfOpen ↗
  • საყრდენი კედელი - 22.09.2025.pdfOpen ↗
  • მშენ. ორგანიზების პროექტი და ეტაპები - 22.09.2025_compressed.pdfOpen ↗
  • გრაფიკი, ეტაპები და ქვითრები- 24.09.2025.pdfOpen ↗
  • კორექტირებული ექსპერტიზა - 03.10.2025.pdfOpen ↗
  • სიმაღლის განსაზღვრის სქემა - 09.10.2025.pdfOpen ↗
  • გრუნტის ცვლილების სქემა 10.10.pdfOpen ↗

Files stay on the city's server. Personal documents (powers of attorney, ID) are not shown here.

All documents on docs.tbilisi.gov.ge ↗

Source: docs.tbilisi.gov.ge - This record reflects the public registry at fetch time and is not legal advice.Request removal