Interim decision

ქალაქი თბილისი, ანა პოლიტკოვსკაიას ქუჩა, N 14

AR11139946Added floorsOther use29 April 2026- Saburtalo
Total floor area
15,925.3 m²
Building footprint
17,859 m²
Plot area
3,423 m²
Height
40 m
Depth below ground
5.8 m
Building volume
61,634.6 m³

Figures as the applicant entered them in the form; not verified.

Sign in to follow

Applicant

Name
ლუკა ჩაგანავა
Developer (company ID)
404891168

People

  • Client
    Name
    ირაკლი შენგელია
    Personal number
    *********60
    Organization
    შპს „თენ“
    Company code
    404891168
  • Chief architect
    Name
    ლუკა ჩაგანავა
    Personal number
    *********74
    Organization
    შპს. ,,ნს სტუდიო''
    Company code
    404496933
  • Specialistმშენებლობის ორგანიზების კალენდარული გრაფიკი
    Name
    ბელა გოგოლაური
  • Specialistსაინჟინრო-გეოლოგიური კვლევის საექსპერტო შეფასება
    Name
    ია მოდებაძე
  • Specialistფუძეების, საძირკვლებისა და სხვა ძირითადი კონსტრუქციების საექსპერტო შეფასება
    Name
    შპს პონტიკა
  • Specialistარქიტექტურული ნაწილების შესაბამისობა „ტექნიკური რეგლამენტის - შენობა-ნაგებობის უსაფრთხოების წესების დამტკიცების თაობაზე “ საქართველოს მთავრობის 2016 წლის 28 იანვრის N41 დადგენილებით დამტკიცებულ რეგლამენტთან
    Name
    ნინო მენთეშაშვილი

The people the applicant named in the application form.

Parcel

Cadastral code
01.14.05.008.158
Owner
შპს "თენ" (404891168)
Area
3,423 m²
Land use
არასასოფლო სამეურნეო

Source: NAPR, the land registry - as of 21 November 2026

Plots and zoning

from the city zoning map (snapshot 30 September 2026)

Document

Number
AR11139946
Status
Interim decision
Registered
29 April 2026
Type
Added floors

Source: TAS, the city's permit system - read from TAS 21 November 2026

Case progress

Waiting on
the applicant
since 20 November 2026 (3 days)
Rounds of remarks
19

Who holds the case comes from its current status; calendar days, counted only for a stretch the record dates; a round is each answer of the city.

Timeline

Newest first.

  1. 20 November 2026City answer

    ქ. თბილისის მერიის სსიპ თბილისის არქიტექტურის სამსახურის მიერ განხილულ იქნა თქვენი საკითხი და განხილვის შედეგად დადგენილ იქნა შემდეგი სახის ხარვეზები, კერძოდ: 01. ვინაიდან, სამშენებლო სამუშაოები ნაწარმოებია უნებართვოდ, საჭიროა წარმოადგინოთ მუნიციპალური ინსპექციის მიერ შესაბამისი დარღვევისათვის გამოცემული აქტი, დაკისრებული ჯარიმის გადახდის ქვითარი და საჭიროების შემთხვევაში, დარღვევით ნაწარმოები მშენებლობის საექსპერტო (კონსტრუქციული) დასკვნა, დამოწმებული სპეციალისტის (ექსპერტის) მიერ და ინფორმაცია შემსრულებლის (ექსპერტის) კვალიფიკაციისა და გამოცდილების შესახებ. 02. წარმოდგენილი იქნას ქალაქ თბილისის მუნიციპალიტეტის მთავრობის 2022 წლის 26 ოქტომბრის N 22.1635.1790 განკარგულების მე-2 პუნქტით გათვალისწინებული ვალდებულების შესრულების დამადასტურებელი დოკუმენტაცია 03. მოსაკრებელი გადახდილ იქნას, რეკონსტრუქციის შედეგად ნამატი ფართის მიხედვით განაშენიანების ინტენსივობის კოეფიციენტის (კ-2) საანგარიშო ფართობის თითოეული კვადრატული მეტრისათვის 10 (ათი) ლარის ოდენობით. 04. +30.30 ნიშნულზე ექსპლიკაცია შეუსაბამეთ ტექნიკური ოთახი, ლიფტის სამანქანეს და კიბის უჯრედის ფართებს. არასრულყოფილი დოკუმენტაციის გამო სამსახური ამ ეტაპზე ვერ გიდგენთ ყველა შესაძლო ხარვეზს. გაითვალისწინეთ, რომ თქვენ გეძლევათ 15 დღიანი ვადა მითითებული ხარვეზის გამოსასწორებლად, თუ დადგენილ ვადაში განმცხადებელი არ წარმოადგენს შესაბამის დოკუმენტაციას, განცხადება დარჩება განუხილველი.

    Show more
  2. 20 November 2026Status changedBack for re-review → Awaiting applicant response
  3. 19 November 2026Status changedInterim decision → Back for re-review
  4. 19 November 2026Files uploaded
  5. 19 November 2026Files uploaded
  6. 17 November 2026City answer

    ქ. თბილისის მერიის სსიპ თბილისის არქიტექტურის სამსახურის მიერ განხილულ იქნა თქვენი საკითხი და განხილვის შედეგად დადგენილ იქნა შემდეგი სახის ხარვეზები, კერძოდ: 01. ვინაიდან, სამშენებლო სამუშაოები ნაწარმოებია უნებართვოდ, საჭიროა წარმოადგინოთ მუნიციპალური ინსპექციის მიერ შესაბამისი დარღვევისათვის გამოცემული აქტი, დაკისრებული ჯარიმის გადახდის ქვითარი და საჭიროების შემთხვევაში, დარღვევით ნაწარმოები მშენებლობის საექსპერტო (კონსტრუქციული) დასკვნა, დამოწმებული სპეციალისტის (ექსპერტის) მიერ და ინფორმაცია შემსრულებლის (ექსპერტის) კვალიფიკაციისა და გამოცდილების შესახებ. 02. წარმოდგენილი იქნას ქალაქ თბილისის მუნიციპალიტეტის მთავრობის 2022 წლის 26 ოქტომბრის N 22.1635.1790 განკარგულების მე-2 პუნქტით გათვალისწინებული ვალდებულების შესრულების დამადასტურებელი დოკუმენტაცია 03. მოსაკრებელი გადახდილ იქნას, რეკონსტრუქციის შედეგად ნამატი ფართის მიხედვით განაშენიანების ინტენსივობის კოეფიციენტის (კ-2) საანგარიშო ფართობის თითოეული კვადრატული მეტრისათვის 10 (ათი) ლარის ოდენობით. 04. გაცნობებთ, რომ სამსახურმა საკითხი შესასწავლად გადაგზავნა საგანგებო სიტუაციების მართვის სამსახურში წერილის ნომერი 60-01263214068 საქმის წარმოების დასრულების შემდეგ პასუხს მიიღებთ შეტყობინების ველში. 05. +30.30 ნიშნულზე G-B და 6-8 ღერძების კვეთაზე არსებულ ფართს მიანიჭეთ შესაბამისი დაკავებულობა. არასრულყოფილი დოკუმენტაციის გამო სამსახური ამ ეტაპზე ვერ გიდგენთ ყველა შესაძლო ხარვეზს. გაითვალისწინეთ, რომ თქვენ გეძლევათ 15 დღიანი ვადა მითითებული ხარვეზის გამოსასწორებლად, თუ დადგენილ ვადაში განმცხადებელი არ წარმოადგენს შესაბამის დოკუმენტაციას, განცხადება დარჩება განუხილველი.

    Show more
  7. 17 November 2026Status changedBack for re-review → Awaiting applicant response
  8. 16 November 2026Status changedInterim decision → Back for re-review
  9. 16 November 2026Files uploaded
  10. 13 November 2026City answer

    ქ. თბილისის მერიის სსიპ თბილისის არქიტექტურის სამსახურის მიერ განხილულ იქნა თქვენი საკითხი და განხილვის შედეგად დადგენილ იქნა შემდეგი სახის ხარვეზები, კერძოდ: 01. ვინაიდან, სამშენებლო სამუშაოები ნაწარმოებია უნებართვოდ, საჭიროა წარმოადგინოთ მუნიციპალური ინსპექციის მიერ შესაბამისი დარღვევისათვის გამოცემული აქტი, დაკისრებული ჯარიმის გადახდის ქვითარი და საჭიროების შემთხვევაში, დარღვევით ნაწარმოები მშენებლობის საექსპერტო (კონსტრუქციული) დასკვნა, დამოწმებული სპეციალისტის (ექსპერტის) მიერ და ინფორმაცია შემსრულებლის (ექსპერტის) კვალიფიკაციისა და გამოცდილების შესახებ. 02. წარმოდგენილი იქნას ქალაქ თბილისის მუნიციპალიტეტის მთავრობის 2022 წლის 26 ოქტომბრის N 22.1635.1790 განკარგულების მე-2 პუნქტით გათვალისწინებული ვალდებულების შესრულების დამადასტურებელი დოკუმენტაცია 03. მოსაკრებელი გადახდილ იქნას, რეკონსტრუქციის შედეგად ნამატი ფართის მიხედვით განაშენიანების ინტენსივობის კოეფიციენტის (კ-2) საანგარიშო ფართობის თითოეული კვადრატული მეტრისათვის 10 (ათი) ლარის ოდენობით. 04. გაცნობებთ, რომ სამსახურმა საკითხი შესასწავლად გადაგზავნა საგანგებო სიტუაციების მართვის სამსახურში წერილის ნომერი 60-01263174207 საქმის წარმოების დასრულების შემდეგ პასუხს მიიღებთ შეტყობინების ველში. არასრულყოფილი დოკუმენტაციის გამო სამსახური ამ ეტაპზე ვერ გიდგენთ ყველა შესაძლო ხარვეზს. გაითვალისწინეთ, რომ თქვენ გეძლევათ 15 დღიანი ვადა მითითებული ხარვეზის გამოსასწორებლად, თუ დადგენილ ვადაში განმცხადებელი არ წარმოადგენს შესაბამის დოკუმენტაციას, განცხადება დარჩება განუხილველი.

    Show more
  11. 12 November 2026City answer
  12. 12 November 2026Files uploaded
  13. 10 November 2026Files uploaded
  14. 9 November 2026Files uploaded
  15. 9 November 2026Files uploaded
  16. 9 November 2026Files uploaded
  17. 9 November 2026Files uploaded
  18. 5 November 2026City answer
  19. 5 November 2026Files uploaded
  20. 5 November 2026Files uploaded
  21. 3 November 2026Files uploaded
  22. 29 October 2026City answer
  23. 29 October 2026Files uploaded
  24. 18 September 2026City answer
  25. 20 August 2026City answer
  26. 20 August 2026Files uploaded
  27. 19 August 2026Files uploaded
  28. 19 August 2026Files uploaded
  29. 14 August 2026Files uploaded
  30. 11 August 2026City answer
  31. 11 August 2026Files uploaded
  32. 11 August 2026Files uploaded
  33. 24 July 2026City answer
  34. 24 July 2026Files uploaded
  35. 24 July 2026Files uploaded
  36. 24 July 2026Files uploaded
  37. 24 July 2026Files uploaded
  38. 24 July 2026Files uploaded
  39. 24 July 2026Files uploaded
  40. 24 July 2026Files uploaded
  41. 20 July 2026City answer
  42. 20 July 2026Files uploaded
  43. 20 July 2026Files uploaded
  44. 10 July 2026City answer
  45. 10 July 2026Files uploaded
  46. 10 July 2026Files uploaded
  47. 8 July 2026City answer
  48. 7 July 2026Files uploaded
  49. 7 July 2026Files uploaded
  50. 7 July 2026Files uploaded
  51. 7 July 2026Files uploaded
  52. 2 July 2026City answer
  53. 2 July 2026Files uploaded
  54. 2 July 2026Files uploaded
  55. 2 July 2026Files uploaded
  56. 2 July 2026Files uploaded
  57. 2 July 2026Files uploaded
  58. 26 June 2026City answer
  59. 26 June 2026Files uploaded
  60. 26 June 2026Files uploaded
  61. 26 June 2026Files uploaded
  62. 26 June 2026Files uploaded
  63. 26 June 2026Files uploaded
  64. 26 June 2026Files uploaded
  65. 12 June 2026City answer
  66. 12 June 2026Files uploaded
  67. 12 June 2026Files uploaded
  68. 12 June 2026Files uploaded
  69. 12 June 2026Files uploaded
  70. 10 June 2026City answer
  71. 10 June 2026Files uploaded
  72. 10 June 2026Files uploaded
  73. 10 June 2026Files uploaded
  74. 10 June 2026Files uploaded
  75. 10 June 2026Files uploaded
  76. 3 June 2026City answer
  77. 3 June 2026Files uploaded
  78. 3 June 2026Files uploaded
  79. 22 May 2026City answer
  80. 22 May 2026Files uploaded
  81. 28 April 2026Files uploaded
  82. 28 April 2026Files uploaded
  83. 28 April 2026Files uploaded
  84. 28 April 2026Files uploaded
  85. 28 April 2026Files uploaded
  86. 28 April 2026Files uploaded
  87. 28 April 2026Files uploaded
  88. 28 April 2026Files uploaded

Documents

Drawings and project files96

  • 02.07.26_ჯიქიას 14 საოფისე შენობა.pla
  • 02.07.26_ჯიქიას 14 საოფისე შენობა გენ-გეგმა.pdfOpen ↗
  • 02.07.26_განახლებული+გენერალური+გეგმა.dwg
  • 02.07.6_შენობის განახლებული გეგმები.pdfOpen ↗
  • 02.07.26_შენობის განახლებული ფასადები.pdfOpen ↗
  • 02.07.26_ჯიქიას 14 საოფისე შენობა.pla
Show all (96)
  • 11.08.26_გენ-გეგმა .pdfOpen ↗
  • 11.08.26_გენ-გეგმა.dwg
  • 11.08.26_შენობის განახლებული გეგმები.pdfOpen ↗
  • 11.08.26_შენობის განახლებული ჭრილები.pdfOpen ↗
  • 11.08.26-ჯიქია.pla
  • 10.07.26_შენობის განახლებული გეგმები.pdfOpen ↗
  • 10.07.26_შენობის განახლებული ფასადები.pdfOpen ↗
  • 10.07.26_ჯიქიას 14 საოფისე შენობა.pla
  • 07.07.26_განახლებული+გენერალური+გეგმა.dwg
  • 07.07.26_შენობის განახლებული გეგმები.pdfOpen ↗
  • 02.07.26_ჯიქიას 14 საოფისე შენობა.pla
  • 24.07.26_შენობის განახლებული გეგმები.pdfOpen ↗
  • 20.07.26_შენობის განახლებული გეგმები.pdfOpen ↗
  • 20.07.26_შენობის განახლებული ფასადები.pdfOpen ↗
  • 20.07.26_ჯიქიას 14 საოფისე შენობა.pla
  • 07.07.26_ჯიქიას 14 საოფისე შენობა.pla
  • 07.07.26_შენობის განახლებული ფასადები.pdfOpen ↗
  • 07.07.26_შენობის განახლებული ჭრილები.pdfOpen ↗
  • 24.07.26_გენ-გეგმა.dwg
  • 24.07.26_შენობის განახლებული გეგმები.pdfOpen ↗
  • 24.07.26_შენობის განახლებული ფასადები.pdfOpen ↗
  • 24.07.26_შენობის განახლებული გეგმები.pdfOpen ↗
  • 24.07.26_შენობის განახლებული ჭრილები.pdfOpen ↗
  • 07.07.26_ჯიქიას 14 საოფისე შენობა გენ-გეგმა.pdfOpen ↗
  • 24.07.26_შენობის განახლებული გეგმები.pdfOpen ↗
  • 24.07.26_ჯიქიას 14 საოფისე შენობაpla.pla
  • 14.08.26_გენ-გეგმა.pdfOpen ↗
  • 14.08.26_გენ-გეგმა.dwg
  • 14.08.26_შენობის განახლებული გეგმები.pdfOpen ↗
  • 14.08.26_შენობის განახლებული ფასადები.pdfOpen ↗
  • 14.08.26-ჯიქია.pla
  • 24.07.26_შენობის განახლებული ჭრილები.pdfOpen ↗
  • 19.08.26_შენობის განახლებული გეგმები.pdfOpen ↗
  • 19.08.26_შენობის განახლებული ფასადები.pdfOpen ↗
  • 19.08.26-ჯიქია.pla
  • 19.08.26-შენობის განახლებული გეგმები.pdfOpen ↗
  • გენერალური გეგმა.pdfOpen ↗
  • გენერალური გეგმა.dwg
  • გეგმები.pdfOpen ↗
  • ფასადები.pdfOpen ↗
  • ჭრილები.pdfOpen ↗
  • ჯიქიქა რენოვაცია მერიის ვერსია სამუშაო ფაილი.pla
  • გენერალური გეგმა 22-05-2026.pdfOpen ↗
  • გენერალური გეგმა 22-05-2026.dwg
  • გეგმები 22-05-2026.pdfOpen ↗
  • ჭრილები 22-05-2026.pdfOpen ↗
  • ფასადები 22-05-2026.pdfOpen ↗
  • 22-05-2026 ჯიქიქა რენოვაცია სამუშაო ფაილი.pla
  • ჯიქიას 14 საოფისე შენობა. 06.10.26.pla
  • შენობის განახლებული გეგმები.pdfOpen ↗
  • შენობის განახლებული ჭრილები.pdfOpen ↗
  • შენობის განახლებული ფასადები.pdfOpen ↗
  • შენობის განახლებული გენერალური გეგმა.pdfOpen ↗
  • განახლებული გენერალური გეგმა.dwg
  • ჯიქიას 14 საოფისე შენობა. 06.12.26.pla
  • გენერალური გეგმა.pdfOpen ↗
  • გენერალური გეგმა.dwg
  • განახლებული ჭრილები.pdfOpen ↗
  • განახლებული ფასადები.pdfOpen ↗
  • განახლებული გეგმები.კროკები. არსებული ანაზომი.pdfOpen ↗
  • განახლებული ჭრილები.pdfOpen ↗
  • განახლებული ფასადები.pdfOpen ↗
  • 26.06.26_შენობის განახლებული გენერალური გეგმა.pdfOpen ↗
  • 26.06.26_განახლებული+გენერალური+გეგმა.dwg
  • 26.06.6_გეგმები.pdfOpen ↗
  • 26.06.26_შენობის განახლებული გენერალური გეგმა.pdfOpen ↗
  • 26.06.6_გეგმები.pdfOpen ↗
  • 26.06.26_შენობის განახლებული ფასადები.pdfOpen ↗
  • 26.06.26_ჯიქიას 14 საოფისე შენობა.pla
  • 26.06.26_ჯიქიას 14 საოფისე შენობა.pla
  • 26.06.6_შენობის განახლებული გეგმები.pdfOpen ↗
  • 09.11.26_შენობის განახლებული გეგმები.pdfOpen ↗
  • 10.11.26_შენობის განახლებული გეგმები.pdfOpen ↗
  • 10.11.26-ჯიქია.pla
  • 05.11.26_შენობის განახლებული გეგმები.pdfOpen ↗
  • 05.11.26_შენობის განახლებული ფასადები.pdfOpen ↗
  • 09.11.26-ჯიქია.pla
  • 29.10.26_გენ-გეგმა.pdfOpen ↗
  • 29.10.26_გენ-გეგმა.dwg
  • 29.10.26_შენობის განახლებული ჭრილები.pdfOpen ↗
  • 29.10.26_შენობის განახლებული ფასადები.pdfOpen ↗
  • 29.10.26-ჯიქია.pla
  • 09.11.26_შენობის განახლებული გეგმები.pdfOpen ↗
  • 09.11.26_შენობის განახლებული ფასადები.pdfOpen ↗
  • 19.11.26_შენობის განახლებული გეგმები ..pdfOpen ↗
  • 05.11.26-ჯიქია.pla
  • 16.11.26_შენობის განახლებული გეგმები.pdfOpen ↗
  • 16.11.26-ჯიქია.pla
  • 19.11.26_შენობის განახლებული გეგმები ..pdfOpen ↗
  • 19.11.26-ჯიქია.pla

Consents and orders3

  • თენ&ფ.პ_თანხმობა_11.10.2022.pdfOpen ↗
  • 12.11.2026+საარქივო+მასალა.+ანაზომი+თანხმობები.rarOpen ↗
  • თანხმობა 30.10.2026.pdfOpen ↗

Reports and surveys8

  • 2026.06.26_ჯიქია საოფისე საინჟინრო პროექტი.pdfOpen ↗
  • 2026.07.09_ჯიქია საოფისე_საინჟინრო პროექტი.pdfOpen ↗
  • 11.08.26_41-ს დასკვნა(ჯიქია)მისაწვდომობა.pdfOpen ↗
  • 2026.07.24_ჯიქია საოფისე_საინჟინრო პროექტი.pdfOpen ↗
  • 41-ს დასკვნა(ჯიქია)მისაწვდომობა.pdfOpen ↗
  • კონსტრუქციები.pdfOpen ↗
Show all (8)
  • კონსტრუქციები 22-05-2026.pdfOpen ↗
  • გეოლოგია.pdfOpen ↗

Other files41

  • 02.07.26_მოპი.pdfOpen ↗
  • 02.07.26_მოპი.pdfOpen ↗
  • 02.07.26_შენობა ნაგებობის მაქსიმალუური სიმაღლის განმსაზღვრელი სქემა.pdfOpen ↗
  • 10.07.26_შენობა ნაგებობის მაქსიმალუური სიმაღლის განმსაზღვრელი სქემა.pdfOpen ↗
  • 07.07.26_მოპი.pdfOpen ↗
  • ჯიქია 41.pdfOpen ↗
Show all (41)
  • 24.07.26_გენ-გენგმა.pdfOpen ↗
  • 07.07.26_შენობა ნაგებობის მაქსიმალუური სიმაღლის განმსაზღვრელი სქემა.pdfOpen ↗
  • 24.07.26_შენობა ნაგებობის მაქსიმალუური სიმაღლის განმსაზღვრელი სქემა.pdfOpen ↗
  • 20.07.26_შენობა ნაგებობის მაქსიმალუური სიმაღლის განმსაზღვრელი.pdfOpen ↗
  • MOP.pdfOpen ↗
  • ფოტოფიქსაციები.pdfOpen ↗
  • სიმაღლის განმსაზღვრელი სქემა.pdfOpen ↗
  • ფოტომონტაჟი.pdfOpen ↗
  • compressed_image.jpgOpen ↗
  • 2.jpgOpen ↗
  • 3.jpgOpen ↗
  • საექსპერტო შეფასების pdf ფაილი..pdfOpen ↗
  • სიმაღლის განმსაზღვრელი სქემა 22-05-2026.pdfOpen ↗
  • ფოტომონტაჟი 22-05-2026.pdfOpen ↗
  • [number]).jpgOpen ↗
  • [number]).jpgOpen ↗
  • [number]).jpgOpen ↗
  • MOP 22-05-2026.pdfOpen ↗
  • საექსპერტო შეფასების pdf ფაილი. 22-05-2026.pdfOpen ↗
  • 1 (1).jpgOpen ↗
  • 1 (2).jpgOpen ↗
  • 1 (3).jpgOpen ↗
  • 1 (4).jpgOpen ↗
  • 1 (5).jpgOpen ↗
  • დაშენება პოლიტკოვსკაის ქ-ზე---განმარტებითი ბარათი.pdfOpen ↗
  • განახლებული ფოტომონტაჟი.pdfOpen ↗
  • 06.09.2026 საარქივო მასალა. ანაზომი.rarOpen ↗
  • შენობა ნაგებობის მაქსიმალუური სიმაღლის განმსაზღვრელი სქემა.pdfOpen ↗
  • შენობა ნაგებობის მაქსიმალუური სიმაღლის განმსაზღვრელი სქემა.pdfOpen ↗
  • მოპ_ახალი.pdfOpen ↗
  • დამატებითი ფაილები.rarOpen ↗
  • ბანერი.pdfOpen ↗
  • იპოთეკარი.pdfOpen ↗
  • 09.11.2026+საარქივო+მასალა.+ანაზომი+ხელშეკრულებები.rarOpen ↗
  • 29.10.26შენობა ნაგებობის მაქსიმალუური სიმაღლის განმსაზღვრელი სქემა.pdf.pdfOpen ↗

Files stay on the city's server. Personal documents (powers of attorney, ID) are not shown here.

All documents on docs.tbilisi.gov.ge ↗

Source: docs.tbilisi.gov.ge - This record reflects the public registry at fetch time and is not legal advice.Request removal